Nutter Corp. pulled out all the stops today to cut up the concrete at Turtle Place and rearrange the setting to accommodate more trees and prepare for the rain gardens that will filter run-off water before sending it off to the storm water system.
The weather might not have cooperated, but it didn’t stop the guys from Nutter, who’ve been making incredible progress.I’ve been wondering how “cutting the concrete” would work and it turns out that’s really what they’re doing. That huge blade is going through like a mega-pizza cutter and making a grid that they’re lifting right out. Amazing!
Check it out for yourself!




